Job

Add one rollback step to your deploy pipeline and rehearse it on staging

One pipeline action redeploys a named earlier release to staging, the health check passes on it and the time is recorded, with a written list of what a rollback does not undo.

What you get

  • A pull request adding the rollback action and a short run note
  • Links to the rehearsal runs: a forward deploy, a rollback to the earlier release and the health check on each
  • A one-page list of what a rollback restores, what it leaves unchanged and what a person must check

and 1 more

Price
From $775Final price agreed before we start
You pay
After the agreed checks pass and you sign off; no payment before sign-off.
Term
One job
How soon
We set up the day after you ask and start work within three days.

No passwords, keys, card details or admin invites needed to start.

Price and terms in full

From $775 Final price agreed before we start

Quoted after we have seen how the pipeline deploys, where releases are kept and how health is checked. The price is fixed for the agreed service and staging environment.

You pay
After the agreed checks pass and you sign off; no payment before sign-off.
Includes
One service, one pipeline and one staging environment; Rollback action, two rehearsal runs, a written limits list and removal steps
Term
One job
Technology
Deployment, GitHub Actions, GitLab CI
Delivery
Start window and delivery date agreed in writing after eligibility and access checks.

Nothing is charged or booked when you send your details. The written quote confirms the total price and any tax before you accept.

What usually happened

You might be seeing

  • Nobody can say with certainty which earlier version is safe to return to
  • Rolling back means reverting commits and waiting for a full pipeline

Who it’s for: A small team whose only recovery from a bad deploy is to fix forward, or whose rollback is a remembered sequence of commands that nobody has run in months.

The result: From the pipeline you already use, one manual action redeploys an earlier release that you name to staging. The health check passes on it, the time from start to healthy is recorded, and you hold a written list of what the rollback does and does not restore. We rehearse it on staging; you run any production rollback yourself.

When it starts, and why it happens

Usually starts when: A deploy went wrong and recovering took longer than expected, or the team realises it cannot name which earlier release it would go back to.

The pipeline can move forward but has no tested way back. Earlier releases may not be kept in a deployable form, the previous version is not identified anywhere, a rollback would also need to undo settings or database changes that were made for the new version, or the procedure exists only in someone's memory and has never been run on a real environment.

What you get

All 4 things you get
  • A pull request adding the rollback action and a short run note
  • Links to the rehearsal runs: a forward deploy, a rollback to the earlier release and the health check on each
  • A one-page list of what a rollback restores, what it leaves unchanged and what a person must check
  • Steps to remove the action

Included

  • One service with one deploy pipeline and one staging environment you control
  • Identify what an earlier release is: an image tag, a build artefact or a platform deployment, and confirm that earlier releases are kept for long enough
Show 3 more
  • Add one manual, parameterised rollback action that deploys a named earlier release using the same steps and health check as a forward deploy
  • Write down what the rollback restores and what it does not: database changes, settings, queued work and caches
  • Rehearse a forward deploy and a rollback on staging and record the times

Not included

  • Running a rollback on your production environment
  • Database rollback, data restore or schema redesign
  • Blue-green, canary or traffic-splitting redesign
  • On-call cover or any promised recovery time
Show 1 more
  • Building a new staging environment or buying hosting

How we know it’s done

Agreed with you before work starts. Each check produces evidence you keep.

Rehearsed one-step rollback: 4 checks and the evidence you keep4 checks, each with the evidence you keep: 1 Manual rollback action deploys earlier release to staging (evidence: Pull request diff, rollback run link); 2 Health check passes, staging version matches earlier release (evidence: Health check result, reported version); 3 Forward deploy after the rollback also succeeds (evidence: Run links, start and healthy times); 4 Limits list: what rollback restores and does not (evidence: Limits list, your written confirmation). When all pass: sign-off (Inspect rehearsal runs, limits list, sign off, merge). When a check fails: You do not pay for this fixed scope.What we checkEvidence you keep1 Manual rollback action deploys earlier releaseto stagingPull request diff, rollback run link2 Health check passes, staging version matchesearlier releaseHealth check result, reported version3 Forward deploy after the rollback also succeedsRun links, start and healthy times4 Limits list: what rollback restores and does notLimits list, your written confirmationAll pass: sign-offInspect rehearsal runs, limits list, sign off, mergeA check failsYou do not pay for this fixed scopeYou decide here Rehearsed one-step rollback: 4 checks and the evidence you keep4 checks, each with the evidence you keep: 1 Manual rollback action deploys earlier release to staging (evidence: Pull request diff, rollback run link); 2 Health check passes, staging version matches earlier release (evidence: Health check result, reported version); 3 Forward deploy after the rollback also succeeds (evidence: Run links, start and healthy times); 4 Limits list: what rollback restores and does not (evidence: Limits list, your written confirmation). When all pass: sign-off (Inspect rehearsal runs, limits list, sign off, merge). When a check fails: You do not pay for this fixed scope.1 Manual rollback action deploysearlier release to stagingEvidence: Pull request diff, rollback run link2 Health check passes, stagingversion matches earlier releaseEvidence: Health check result, reportedversion3 Forward deploy after the rollbackalso succeedsEvidence: Run links, start and healthy times4 Limits list: what rollback restoresand does notEvidence: Limits list, your writtenconfirmationAll pass: sign-offInspect rehearsalruns, limits list, signoff, mergeA check failsYou do not pay forthis fixed scopeYou decide here
The checks we run, the evidence you keep for each, and what happens next. Drawn from the checks on this page.
The 4 checks in full, with the evidence you keep
  1. A manual rollback action exists in the pipeline and, given the name of an earlier release, deploys that release to staging using the same steps as a forward deploy.

    Evidence: The pull request diff and the rollback run link showing the named release deployed.

  2. After the rollback run, the agreed health check passes on staging and the version reported by staging matches the named earlier release.

    Evidence: The health check result and the reported version from the run.

  3. A forward deploy of the current release after the rollback also succeeds, and the time from start to healthy is recorded for both runs.

    Evidence: Both run links with start and healthy times.

  4. The written limits list names what a rollback restores and what it does not, including database changes, settings and queued work, and your maintainer confirms it is accurate for your system.

    Evidence: The limits list and your written confirmation.

Sign-off. You inspect the rehearsal runs and the limits list, sign off in writing and merge the pull request. Payment follows sign-off.

If it fails. If the rollback does not restore the named release on staging, you do not pay for this fixed scope. If earlier releases are not retained or staging is not isolated, we explain what is needed and stop.

How we deliver

We arrange the work and independent review, then show you the result against the agreed checks. You keep authority over your systems.

Rehearsed one-step rollback: how it is delivered, step by stepSteps in order: 1 Agree in writing (service, staging, earlier release, approval route); 2 Read deploy steps (identify earlier release and where it is stored); 3 Add rollback action (manual, deploys named earlier release by same steps); 4 Write rollback limits (restores and leaves unchanged, database and settings limits); 5 Your person approves (forward deploy and rollback on staging, record times); 6 Independent reviewer checks (runs, action, limits list, hand over pull request); 7 sign-off (Inspect rehearsal runs, limits list, sign off, merge). You decide at step 1, step 5 and the sign-off. We stop and tell you if any of the 4 conditions listed on this page applies.1 Agree in writingservice, staging, earlierrelease, approval route2 Read deploy stepsidentify earlier releaseand where it is stored3 Add rollbackactionmanual, deploys namedearlier release by samesteps4 Write rollbacklimitsrestores and leavesunchanged, databaseand settings limits5 Your personapprovesforward deploy androllback on staging,record times6 Independentreviewer checksruns, action, limits list,hand over pull request7 Sign-offInspect rehearsal runs,limits list, sign off,mergeWe stop and tell you ifany of the 4 conditions listed on this page appliesYou decide here Rehearsed one-step rollback: how it is delivered, step by stepSteps in order: 1 Agree in writing (service, staging, earlier release, approval route); 2 Read deploy steps (identify earlier release and where it is stored); 3 Add rollback action (manual, deploys named earlier release by same steps); 4 Write rollback limits (restores and leaves unchanged, database and settings limits); 5 Your person approves (forward deploy and rollback on staging, record times); 6 Independent reviewer checks (runs, action, limits list, hand over pull request); 7 sign-off (Inspect rehearsal runs, limits list, sign off, merge). You decide at step 1, step 5 and the sign-off. We stop and tell you if any of the 4 conditions listed on this page applies.1 Agree in writingservice, staging, earlier release, approvalroute2 Read deploy stepsidentify earlier release and where it is stored3 Add rollback actionmanual, deploys named earlier release bysame steps4 Write rollback limitsrestores and leaves unchanged, database andsettings limits5 Your person approvesforward deploy and rollback on staging,record times6 Independent reviewer checksruns, action, limits list, hand over pull request7 Sign-offInspect rehearsal runs, limits list, sign off,mergeWe stop and tell you ifany of the 4 conditions listed on this pageappliesYou decide here
How we deliver it, in order. A box with a coloured border is where you decide. Drawn from the delivery steps on this page.
The 6 delivery steps in full
  • Agree the service, the staging environment, the earlier release to rehearse against and the approval route in writing
  • Read the deploy steps and identify what an earlier release is and where it is stored
  • Add a manual rollback action that deploys a named earlier release by the same steps and health check as a forward deploy
  • Write what a rollback restores and what it leaves unchanged, with the database and settings limits stated
  • Have your person approve a forward deploy and a rollback on staging, and record the times and health results
  • Have an independent reviewer check the runs, the action and the limits list, then hand over the pull request and removal steps

This is a one-off job, not emergency cover or a subscription. We confirm eligibility, the total price, a start window and a delivery date before you accept. Work starts only after agreed inputs, secure access and necessary permissions are in place. Platform, runner and supplier charges are excluded unless the written quote includes them. No charge or booking is created by sending a message.

When it fits, and when we stop

It fits when

  • The pipeline already deploys to a staging environment that is separate from production and holds no production data
  • Earlier releases are identifiable and retained: tagged images, stored artefacts or a platform that keeps deployments
Show 2 more
  • A health check URL or command exists or can be agreed
  • A person on your side holds the deploy credentials and approves each rehearsal run

We stop and tell you if

  • Staging does not exist, or shares data with production
  • Earlier releases are not kept, so there is nothing to return to; we explain what must be retained and stop
Show 2 more
  • The release changes the database in a way the earlier release cannot read, and no one can agree a compatible order
  • A rehearsal would send real messages, charge cards or touch customer data

Check whether this job fits

These questions show whether there is anything to roll back to. Answer from how you deploy today.

Answer 4 questions to see if it fits
Can you name the release you would go back to, and is it still available to deploy?
Is there a staging environment separate from production, holding only test data?
Is there a clear signal that a release is healthy?
Do releases change the database structure?

Answer the questions to see whether this job fits.

Nothing is sent anywhere until you choose to email us.

Ask about this job

What could go wrong

Before merge, closing the pull request leaves your pipeline unchanged. After merge, your maintainer can delete the rollback action; forward deploys do not depend on it. A staging rehearsal is itself reversible by deploying the current release again.

3 risks, and how we handle each

Scroll the table sideways to read it all.

RiskHow we handle it
A rollback works for the code but leaves the database in a shape the earlier release cannot read.The limits list says so plainly, and the rehearsal records which database changes were involved. We do not offer a database rollback.
A staging pass is read as proof that production will behave the same.The handover states that staging is a rehearsal only. You run and verify any production rollback under your own checks.
A rehearsal sends messages or touches real data.We stop if staging is not isolated, and the approval step lets your person cancel a run.

An independent reviewer checks that the rollback uses the same deploy path as a forward deploy, that the rehearsal really restored the earlier version and that the limits list does not overstate what is restored. Your person approves every run that deploys, and your maintainer merges.

Need to keep it working?

A full-time AI agent can look after this kind of work, or tell us what you want looked after when you ask.

What ongoing work would cover, and what it does not

If you want the rollback checked regularly, a monthly rehearsal can run it and report whether it still works.

Ongoing work is separately scoped and quoted: no monitoring, response-time guarantee or automatic subscription is included in this job.

What you can check

Other ways to get this done
  • If you deploy on a platform that keeps earlier deployments, its own rollback feature may already do this. Vercel documents that its instant rollback reassigns domains to an earlier deployment without rebuilding, and that environment variables are not rolled back. vercel.com
  • GitHub environments can require a reviewer before a deploy job runs, which gives a rehearsal run a human approval step. docs.github.com

Questions

Will you roll back our production site?

No. We rehearse on staging with your person approving each run. You decide and run any production rollback.

Can a rollback undo a database migration?

Not in this job. A rollback of code does not change data, and the written limits list states what the earlier release can and cannot read.

Does this promise a recovery time?

No. We record the times we observe on staging. They are not a promise about production.

Ask about this job

What to send us, what comes later, and who owns what

Send us

  • A short description of how a deploy runs today and where releases are kept
  • Whether staging exists, what it deploys and whether it holds only test data
  • How the team knows a deploy is healthy: a page, an endpoint or a command
  • Do not send credentials, source code or an access invitation in your first message

Later, once you agree

  • The deploy pipeline file and any deploy scripts through an authorised company-controlled route
  • A staging deploy approval route: the credentials stay in your secret store and your person approves each run
  • The health check and the earlier release to rehearse against

You own the pipeline, the environments, the credentials and every production decision. We work from authorised files on a branch, and any run that deploys to staging is approved by your person using credentials we never see. We do not run anything against production.

Add detail (optional)

A web address anyone can open, with no login in it. No code or logs.

We reply by email. Sending this emails your request to our team; nothing is kept in a website database. Please do not send passwords, keys or customer records. Privacy notice.

Email fallback: open your mail app

If website submission is unavailable, review and send the fallback email yourself. An email fallback is not a website receipt. Or write to hello@syntheticindustry.ai and say which job you mean.

Last revised 13 October 2026